+1 (832) 730-5220 Sales Ext: 102 - Engineering Ext: 108 - Accounting Ext: 104 - Office Manager Ext: 104 info@powergencontrols.com

LOAD SHEDDING / PEAK SHAVING

LOAD SHEDDING/PEAK SHAVING

Load-shedding schemes can be implemented to control peak demand levels or to ensure service continuity to critical loads. Circuit breakers sequencing can be used to close and/or open circuit breakers in accordance with user specified sequences and/or applications. These systems can be used for:

  • Powering large motors across several billing KW demand periods to avoid demand penalties.
  • Circuit Breakers can be selectively opened as needed according to user defined priorities, based on monitored power demand values.
  • Frequency based control
  • Load reduction to match generator supply
  • Demand control
  • Peak shaving

POWERGEN CONTROLS IS A 24/7 ENGINEERING SERVICES PROVIDER,

available whenever and wherever you need us
CONTACT US